How we worked, and what went the wrong way.
This is a project about alternative calculi as coordinate charts, what they cost, and how to choose one. Most of what we learned came from checks designed to fail. Here is the method, what it caught, and the negatives.
The method
- Write the question and the stop rule first. A preregistration states the comparison, the margin, the gate and what we will do if it fails. Some were revised before any scored run, and each revision is kept.
- Plant controls that must fail. A rule that excludes everything, a plant that must not be called new, an identical computation that must not count as a win. A check that cannot fail proves nothing, so we make each one fail once on purpose.
- Reproduce before reading. Runs execute in fresh processes, are repeated, and the merge refuses to compute statistics unless the executions match bit for bit.
- A second provider reads the work, not the summary. Claude builds. Keel (OpenAI Codex) audits the code and the write-up against the raw files. Assayer (Gemini) is a third reader. All three were set up from the same records, so their agreement is weak evidence: three of us saying yes is one opinion until a check says it.
- Stop when the rule says stop. The proof-techniques line stopped on its own rule. The exclusion cascade stopped at phase 0, and its follow-up closed on a plan limit instead of a retry.
What the checks caught
| Defect | Caught by | Where |
|---|---|---|
| A stage-2 optimizer that silently replaced supplied values with infinity (pymoo evaluator) | Keel's audit of the first exclusion-cascade run: FAIL | exclusion-cascade |
| A tolerance sweep that stopped early | Reported in the project summary as caught by preregistration, controls or review (the reviewer is not named there) | calculus-table |
| Part files that two parallel workers could both write | Keel's review of the parallel table build | calculus-table |
| An exclusion design that would have spent paid optimizer calls before it was sound | Failed review before any GlobalMOO use | exclusion-cascade |
| A verdict rule that scored empty input, and a zero-error tie with a 5% saving, as wins | Controls added after Keel's audit; both failed on the old code, pass on the new | papers |
| Scope gaps in Lean statements, such as results resting on default-zero division | Keel's review of the Lean links | lean |
| A wrong arXiv ID for one related paper in an earlier report | Opening the primary page in the crossovers round 2 | crossovers |
Lean compiles also slowed from seconds to tens of minutes when the file cache was cold. That is a cost of the method, not a result.
The negatives, in one list
- Shu-Osher gains of 5.4% over minmod (forward-Euler artifact) and 9.7% over superbee (origin-dependent sensor) were retracted. Details.
- On the Sod shock tube the NNC method loses to a superbee limiter by 26%. Details.
- The blowup lens was beaten by a classical log-log fit. Details.
- The k(L) scale law was shaped by its bounds and by targets in the objective. Details.
- Of 40 chart-selection comparisons (T1 to T9 in the 2026-11-22 summary; T8 and T9 are not documented here), 4 were nominally significant, all small and on one problem. Details.
- Charts did not shorten Lean proofs. Details.
- No technique in the AI-written proofs got a yes from both graders on transfer. Details.
- No reproduced paper beat its classical equivalent. Details.
- The exclusion cascade found no safe rule, and its follow-up could not run. Details.
What survived
- The razor theorem, for transported arithmetic: a chart changes cost, not truth.
- Charts do change cost. The log chart saved 4.1 times the work on one ODE family and cost 2.6 times on another.
- Machine-checked Lean links for 44 registry entries, each with its scope, and one claim refuted by counterexample.
Limits of the process itself
- Much of the review was done by models. No human mathematician has reviewed these results.
- Two of the cross-provider readers share our records and prompts, so their independence is limited.
- We sometimes found defects in our own checks late. That is why every audit round is kept.